PROJECTS COMPLETED
Ultra Low Sulfur Diesel Pipeline Conductivity Project
ExxonMobil Oil, Guam
1000 ft x 10” Aviation Fuel Connectivity Pipeline
ExxonMobil Oil, Guam
Fire Line Ring Repair
Cabras Terminal, Guam; ExxonMobil
Design/Build of 100,000 Gallon Diesel Fuel Storage Tank
Guam Medical Regional Hospital, Guam
Hagatña Retail Gas Station Rehabilitation and Up-Grade Project
ExxonMobil Oil, Guam
Anigua Retail Gas Station Rehabilitation and Up-Grade Project
ExxonMobil Oil, Guam
USPS Roof Assessment and Aggressive Action Project
Barrigada, Tamuning, Saipan
115KV Power Pole Concreting of Foundation
Guam (MDCI 637-4433)
Construction of 45 Mary Brown’s Restaurants
Canada, Nationwide Locations
1933 Tank (267 FT. Diameter) Repair & Commissioning (as per API Standards)
Tristar Management, Agat, Guam
Fuel Tank Replacement for Back-Up Power System
Naval Hospital, Guam
Mass Foundation Project
AAFB, Guam
Construction of By-Pass Fuel Systems
Andersen Air Force Base, Guam
Construction of 12’ X 9000 LF Water Main
Guam Waterworks, Santa Rita, Guam
Re-Bottom & Replace Half of First Course of Tank 4
Shell Oil Palau, Palau Bulk Plant
Install Electrical High-Level Alarm System
Mobil Oil Micronesia Inc., Palau & Pohnpei Mobil Bulk Terminal — Contact: 479-3271
Construction of Tank Truck Loading Rack Piping & Canopy
Mobil Oil Micronesia Inc., Chuuk Mobil Bulk Terminal — Contact: 479-3271
Construction of Valve Pit Foundations
Weston/Pacific Tank Works, Sasa Valley & Piti, Guam
Sandblast & Paint Smoke Stacks
Orote Power Plant, COMNAMVAR
Fuel Bulk Tank Structural Refurbishment & Painting
Mobil Oil Micronesia Inc., Palau Mobil Bulk Terminal — Contact: 479-3271
Construction of 12” DIAMETER X 9,000’ Dip Water Main
Guam Water Works, Santa Rita, Guam
Welding Repair & Painting as per API Standard of Fuel Bulk Tank #1
Mobil Oil Micronesia Inc., Palau
Repair of Submarine Platform Brow; Structural Welding & Painting
COMNAVMAR
Install Sewer Lift Station 2,770’ Sewer Line
Rhino Builders, Sumay Cove Marina, COMNAVMAR
Re-Construction of 4.5 Mile Pol Access Road
Rhino Builder, Sinajana, Guam
Install 6” X 800’ Sewer Line w/ Manholes
Agbayani Construction Corp., Andersen Air Force Base, Guam
Install 6” X 75’ Sewer Line w/ 2 Manholes to Commissioned Lines
BW Construction, Naval Hospital
CL Taitano Elementary School; Civil Works/Infrastructure/All Utilities
Orion Construction Corp., Sinjana, Guam — Contact: 649-2203
Underground Electrical Utility Project
Santa Barbara, Dededo, Guam (MDCI 637-4433)
Interior Renovation of HC5 Function Room
AAFB, Guam (MS1 Angeles — Contact: 339-6130)
Demolition/Disposal of Fuel Tank & Berm
Orion Construction Corp. — Contact: 649-2203
Pol Fuel Line, AAFB; Installation of Leak Detection Probe System
Nova Group
Fabrication/Installation of Chlorine & Genset Duct System at Various Waterwell Pump Stations
Marianas Drilling Inc. — Contact: 646-5500, Guam
Santiago Apartments
Tumon, Guam — Contact: Arsenio Santiago, 646-4516
Chataan Typhoon Clean-Up
EMQ, Washington — Guam